Projects
The project was developed using BIM methodology from conception to project supervision.
The development of the executive project was carried out using the BIM (Building Information Modelling) methodology from the conceptual, planning, organisation, construction and supervision stages of the project.
Design inspired by a Mexican, colonial and sustainable style.