Geometric design of the Circuito Interior | Revolución | Patriotismo Corridor.

The project will reduce travel times, improve road management, safety and environmental restoration.

Metrobus Line 0 Project


The Circuito Interior Corridor intersects with the most important roads of the City at one or more points along its route and is planned to connect with 34 stations of the current Metro network, 28 Metrobus stations and 11 Modal Transfer Centres (CETRAM), with the main function of redistributing trips in a tangential way avoiding unnecessary penetration into the central area of the City, to allow trips that have as origin and destination opposite points of the metropolitan area to be distributed in a more efficient and rational way before reaching the central area.

46.1 km
Extension for direction
28
Metrobus connections
34
Metro connections
22
Connections with CETRAM

MBL0


The Metrobus for the Circuito Interior Bicentenario, Av. Revolución and Patriotismo, will reduce travel times, improve road order, implement safe access to stations, safety, restoration and environmental compensation measures, stations in coexistence with cycle paths, among others.